AI-powered switching planning is here
Describe the work in plain language, or drop in an email, works notice or PDF. EdiForge builds a complete, ADMS-ready switching schedule, tracks it through approval, and matches field crews to it. It is the most advanced way a control room can plan and manage network switching.
Calendar view
September 2026Describe it in plain English. EdiForge does the rest.
Planning switching has always meant working through a long, unforgiving form. EdiForge replaces that with a conversation, so the operator reviews a finished draft instead of filling one in.
Say what you need
“Outage on Feeder 3 next Tuesday 09:00–16:00 for a recloser upgrade.” EdiForge reads the sentence and fills every field of the switching schedule header.
Drop in the paperwork
Attach an email, works notice, PDF or DOCX. EdiForge extracts the dates, assets, region and access reason and builds the header before you’ve finished reading it.
Review, don’t retype
You check the draft and approve. The operator stays in command of every decision. The form-filling is simply gone.
Everything the control room needs, on one screen
From the first line of a request to a crew confirmed on site, EdiForge keeps the plan, its status and the people assigned to it moving together.
One intelligent layer over the systems you already run
EdiForge adds intelligence, not another database. It reads the operator’s intent, assembles the schedule, and writes it through the same integration your ADMS already trusts.
A sentence, a dropped-in document, one screen. No forms to hunt through.
AI Request Builder · schedule-header engine · lifecycle state machine · resource matching
The same SOAP contract your control room already uses, with no parallel database and no second source of truth.
ADMS · SCADA · OMS · GIS · EdiVision network model
Planned work, without the paperwork
EdiForge is built for the teams who plan switching, move it through approval and get crews to site, and who have better things to do than retype a form.
AI does the heavy lifting
The most advanced switching schedule manager built for the control room. Describe the work; EdiForge assembles the schedule, the status and the crew list around it.
One flow, start to finish
Calendar, schedule header, lifecycle status and field resourcing in a single view, instead of separate tools and spreadsheets that drift apart.
Operators stay in control
Every schedule moves forward only on an operator’s approval, and every step is logged against the ADMS lifecycle for a complete audit trail.
Fits the way you already work
EdiForge speaks your existing network management systems’ language, mirroring the switching model your team defines and submits today.
Watch EdiForge build a switching schedule from a sentence
We’ll take a real request, spoken or dropped in as a document, and show EdiForge turn it into an approved, resourced switching schedule against your existing network management systems. Live, in a few minutes.